The Ministry of Municipalities and Housing has issued the final regulations for shops selling and renting construction equipment, effective 26 October 2026, to govern the activity through the Balady platform. The guide divides shops into two categories based on equipment type and sets minimum areas, required approvals, and technical and operational conditions that must be met before operations begin.

Which Authorities Must Approve a Construction Equipment Rental License?

The license passes through three official gates: a valid commercial register that includes the activity; a municipal license via the Balady platform under the ministerial conditions; and Civil Defense approval before issuance, plus approval from the supervising authority for the activity where applicable.

What Is the Difference Between Category A (Heavy Equipment) and Category B (Light Equipment)?

The conditions separate site and area requirements for each category as follows:

ItemCategory A: Heavy EquipmentCategory B: Light Equipment
Permitted LocationIndustrial zones and supporting service areas; allowed outside them after study by the Amanah/municipalityCommercial streets, industrial zones, or supporting service areas inside an existing building
Minimum Area300 m²24 m²
Special RequirementsWaiting seats, fences around open yards, sufficient space for equipment maneuvering, canopy covering 100% of remaining land after setbackReception office (required in both categories)

If you choose a Category A site outside industrial zones, the ministry requires it to be on a regional road or commercial street, not conflict with surrounding activities or affect traffic flow, and not cause environmental, noise, or visual pollution.

What Are the Core Municipal Licensing Requirements?

Article 1 of the conditions stipulates four requirements for issuing, renewing, amending, suspending, and cancelling the license:

  1. Follow the Municipal Licensing Procedures System and its executive regulations.
  2. Obtain Civil Defense approval before the license is issued.
  3. Submit a valid commercial register that includes the activity or activities to be licensed.
  4. Obtain approval from the supervising authority for the activity where one exists.

The conditions also mandate obtaining the municipal license before starting operations and prohibit practicing any additional activity not listed in the license.

What Are the Key Technical and Operational Conditions?

  • Apply the Saudi Building Code requirements, with design and supervision by engineering offices accredited by the ministry.
  • Refer to the Saudi Fire Protection Code (SBC 801).
  • Provide a reception office in all categories.
  • Allow a canopy covering 100% of the remaining land after setback for Category A shops.
  • Provide a first-aid kit and remove damaged tools and machinery that cannot be repaired.
  • Maintain cleanliness of rented equipment and prevent non-specialists from entering storage and work areas.
  • Prohibit practicing the activity outside the facility boundaries or using public sidewalks and setback areas.

What About Warehouses and Additional Activities?

A warehouse for low-hazard materials related to the activity is permitted, not exceeding 25% of the area stated in the license and capped at 150 m². This can be increased to 50% of the area by adding warehousing as an additional activity and applying warehouse conditions. Additional activities must not exceed 50% of the total area in aggregate, and each individual additional activity must be at least 6 m².

Is Registration of Heavy Equipment with the Heavy Equipment Regulation Center Mandatory?

Yes. The Heavy Equipment Regulation Center was established by Council of Ministers Resolution No. 488 dated 24/08/1442H under the Saudi Standards, Metrology and Quality Organization. Its tasks include: creating a heavy equipment database (inventory, ownership registration, and data); accrediting inspection bodies for equipment safety and overseeing pre-operation inspections; accrediting training bodies for equipment operators and setting qualification and licensing rules; and setting controls for equipment service life and disposal. In March 2026 the center launched an awareness campaign titled "Now Regulated" urging owners and operators to register.

What Are the Steps to Issue the License via the Balady Platform?

  1. Log in to the Balady platform and select the "Issue Commercial License" service.
  2. Select the activity: "Sale and Rental of Construction Equipment" and choose Category A or B.
  3. Attach the valid commercial register that includes the activity.
  4. Attach Civil Defense approval.
  5. Attach approval from the supervising authority (if applicable).
  6. Attach approved drawings from an accredited engineering office showing the site complies with spatial conditions (area, setbacks, fences, canopies, reception office).
  7. Pay the fees and receive the electronic license.

Key Figures at a Glance

  • Effective date of final conditions: 26 October 2026 (Ministry of Municipalities and Housing)
  • Minimum area – Category A: 300 m²
  • Minimum area – Category B: 24 m²
  • Permitted warehouse ratio without additional activity: 25% of area, maximum 150 m²
  • Total additional activities ratio: Not exceeding 50% of total area
  • Minimum area for a single additional activity: 6 m²
  • Heavy Equipment Regulation Center establishment resolution: No. 488 dated 24/08/1442H

Bottom Line and What to Watch

Before leasing land or buying equipment, determine the appropriate category (heavy or light) and verify that the required site and area are available. Prepare the commercial register, Civil Defense approval, and accredited engineering drawings, then submit the application via the Balady platform. Do not forget to register heavy equipment with the Heavy Equipment Regulation Center under the Saudi Standards, Metrology and Quality Organization, and monitor any updates to the conditions on the ministry’s official website or the Balady platform.