Eagle KSA
ثقافة واجتماعOriginal Report

Saudi Child Daycare Licensing: Conditions, Steps & Documents via Ta'heel 2026

ف
فريق تحرير صقر الجزيرةفريق التحرير
||662 views
دليل شامل للحصول على ترخيص مركز ضيافة أطفال في السعودية

The Ministry of Human Resources and Social Development has launched an electronic service for licensing private child daycare centers through the Ta'heel platform, eliminating the need to visit the ministry or its branches. The service is free, with a processing time of five working days, and targets citizens, non-profit entities, and youth.

What Is a Private Child Daycare Center and Who Licenses It?

Private child daycare centers are facilities that provide daytime care, educational activities, and recreation for children. They are governed by the organizational regulations issued by the Ministry of Human Resources and Social Development. The regulations aim to organize the sector, activate the role of Saudi women, and increase their employment opportunities in childcare. The ministry is the licensing and supervisory authority.

Who Can Apply and What Are the Requirements?

According to the service page and a ministry announcement on X (March 2024), eligible applicants are individuals, women, non-profit entities, and youth. Core conditions include:

  • The applicant must be a citizen or an investor.
  • Minimum age of 18 years.
  • No previous license revoked for violations unless at least three years have passed since closure.

Note: Earlier clarifications (March 2021) listed additional conditions such as not being a government employee, no final convictions for crimes against honor or trust, a minimum age of 25 for home-based centers with a medical report and first-aid certificate. Those conditions come from an old clarification; verify current requirements on the platform before relying on them.

What Are the Licensing Steps?

  1. Access the service via the Ministry of Human Resources and Social Development website.
  2. Log in to the Ta'heel platform (Social Rehabilitation and Guidance).
  3. Request preliminary approval as a natural person or a legal entity (company/organization).
  4. Prepare the premises and obtain required licenses from other authorities during the preliminary approval period.
  5. Request final license issuance using the preliminary approval number and remaining requirements.

The platform allows cancellation of preliminary approval if the applicant decides not to proceed.

What Documents Are Required at Each Stage?

Stage One: Preliminary Approval

Applicant TypeDocuments
Natural PersonNational ID, national address and place of residence, owner contact details
Legal EntityCommercial register, license, or proof of legal status; national address; authorized representative's name and ID; authorized contact details

The ministry stresses the need to review Civil Defense and Baladi requirements early.

Stage Two: Final License

  • Preliminary approval number
  • Commercial register number
  • Center location on map
  • Civil Defense license
  • Accredited engineering office visit report
  • Municipal (Baladi) license

This stage typically takes the longest because it depends on building readiness and meeting safety and municipal standards.

What Are the Fees and Timelines?

  • Fees: Free (ministry service only).
  • Processing time: Five working days for the ministry to process the application.

Important: The timeline excludes time needed to prepare the premises and obtain municipal, Civil Defense, and engineering licenses. A free ministry service does not mean the project has no costs; fit-out, staffing, and other licenses carry their own expenses.

What Is New in the 2026 Draft Regulations?

The ministry published a public consultation on updated organizational regulations via the Istilaa platform between 9 Shawwal and 11 Dhul-Qi'dah 1447 AH (May 2026), targeting individuals and non-profit entities. The draft aims to organize center operations, provide purposeful educational and recreational activities, and enhance Saudi women's role and job opportunities in childcare. News outlets have reported draft provisions such as minimum space per child and surveillance cameras with recording storage. These are draft provisions subject to change in the final version; do not base facility designs on circulated figures. Refer to the final version published by the ministry.

Key Figures

What to Watch Before Investing

  • Select the site after reviewing municipal and Civil Defense requirements, not before; a building that fails standards wastes time and money.
  • Review the final regulations once adopted; do not rely on draft consultation clauses.
  • Prepare engineering documents (accredited engineering office report) early.
  • Calculate fit-out, operational, and other licensing costs separately from the free ministry fee.

Summary and What to Monitor

Licensing is completed electronically in two stages via the Ta'heel platform, free of charge, with a five-day ministry processing window. The real bottleneck is premises readiness and third-party licenses. Track the adoption of updated regulations on the ministry website and the Istilaa platform before starting design or contracting, and verify municipal and Civil Defense requirements for the candidate site first.

مشاركة: