Saudi Engineering Consultancy License: Requirements, Fees & Mumaris Plus Steps (2026 Guide)

The Saudi Council of Engineers issues the engineering consultancy office license through its Mumaris Plus electronic platform, granting instant issuance once requirements are met and fees are paid. This guide covers the licenseable categories, conditions for each, official fees, application steps, and the difference between provisional and final licenses — based on the Council's official service guide. (Source: Professional Registration – Service Guide | SCFHS)
Which engineering office categories can be licensed?
The Council classifies engineering offices into three main categories for individuals, and adds corporate categories under the engineering practice standards: (Source: Driver’s License Renewal via Absher – Fees, Steps & Medical Exam | Al-Waeam)
- Engineering Consultancy Office/Company: Provides studies, designs, engineering supervision, and project management in one or more disciplines.
- Specialized Engineering Office/Company: Limited to studies and designs in the owner’s discipline only.
- Engineering Support Services Office/Company: Provides support services in a single discipline only.
Corporate categories include: integrated contracting companies for complex projects, temporary foreign contracting companies engaged with government entities, and foreign engineering companies licensed by the investment authority. (Source: License Closure | RIPC)
What are the engineering office license fees?
The Council sets the service fees on its e-services page, with instant issuance via Mumaris Plus:
| Office Type | Main | Branch |
|---|---|---|
| Engineering Consultancy Office | 4,000 SAR | 4,000 SAR |
| Specialized Engineering Office | 2,000 SAR | 2,000 SAR |
| Engineering Support Services Office | 1,000 SAR | 1,000 SAR |
Note: These are Council fees only; they do not include commercial registration fees, municipal license fees, or professional accreditation fees for engineers.
What are the conditions for an engineering consultancy license?
The standards require general conditions for all categories, plus category-specific conditions:
General conditions (all categories)
- The applicant must hold the appropriate academic qualification for the required disciplines.
- Good conduct and reputation; no conviction for an offense involving honor or integrity unless rehabilitated.
- Undertaking to provide engineering staff, equipment, and devices suitable for the scope of work.
- Registration with the Council and documentation of official stamps and signatures.
Conditions specific to the consultancy category
- The applicant must be accredited by the Council at a professional grade no lower than Professional, or have documented practical experience of no less than ten years.
- Provision of engineering staff and a suitable workplace.
Conditions for the other categories
- Specialized Office: Grade of Associate or experience of no less than four years.
- Support Services Office: Experience of no less than two years.
Have the experience requirements changed recently?
In 2022 the Council published a draft updated standard on its consultation platform, proposing for the consultancy category a grade of “Professional Engineer” or experience of no less than eight years, with a license term of one, two, or three years at the applicant’s choice. The draft was open for comments only; the binding rule is what the Mumaris Plus platform displays when you apply. Do not base your plan on a single figure before verifying it on the platform.
How to apply for the license step by step
- Obtain professional accreditation: Register on the Saudi Council of Engineers’ accreditation portal and confirm your professional grade matches the target category.
- Select the category and disciplines: Consultancy, specialized, or support services, and the engineering disciplines involved.
- Prepare the premises and staff: As required by the category, or apply for a provisional license to set them up within one year.
- Submit the application via Mumaris Plus: offices.saudieng.sa, and choose the service “Issue Main Engineering Consultancy Office License.”
- Pay the announced fees and receive the license instantly once requirements are satisfied.
- Complete municipal requirements: Through the Balady platform, and apply for classification with the Ministry of Municipalities and Housing if your work requires it.
What is the provisional license and when does it become final?
- Newly established offices are licensed on a provisional basis for one year to set up premises and secure staff.
- Practicing engineering work is prohibited during the provisional license; doing so constitutes a violation of the regulations.
- After completing the requirements, the final license is issued.
- License duration is three years up to a maximum of five years.
- Renewal: at least two months before expiry.
- License expiry: the owner must cease practice immediately; if the cessation exceeds one year, the license is permanently struck off.
What is the Ministry of Municipalities and Housing’s role with engineering offices?
The Ministry of Municipalities and Housing provides engineering office qualification and classification services, including issuing and renewing classification certificates and adding fields of work. Municipal classification is separate from the Council’s license and may be required depending on the project types you will undertake.
Key figures at a glance
- Main/Branch Consultancy Office fee: 4,000 SAR
- Main/Branch Specialized Office fee: 2,000 SAR
- Main/Branch Support Services Office fee: 1,000 SAR
- Provisional license term: one year
- Final license term: 3–5 years
- Renewal window: two months before expiry
- Strike-off after cessation: one year
Bottom line and what to watch
Start by obtaining the appropriate professional accreditation for your target category, then check the Mumaris Plus platform at the moment of application for current conditions and fees — especially since the 2022 standards update was only a consultation draft. Complete the municipal license via the Balady platform and the Ministry of Municipalities and Housing classification if required. Do not practice any engineering work before the final license is issued, and avoid strike-off by renewing early.